New roof systems for commercial buildings

Commercial Roof Replacement in the Bay Area

Replacing a commercial roof is a capital project, and the decisions made at the start decide how long the new roof lasts. We look at what the building really needs, from drainage and insulation to energy code and scheduling, and install a system built for the next several decades.

Get a Commercial Roof Replacement Estimate

No obligation · Response within 30 minutes

Commercial Roof Replacement

Planning a Commercial Roof Replacement

Every replacement starts with an assessment of the existing roof, including checks for trapped moisture. How wet the insulation is decides whether the old roof has to come off entirely or whether a new system can go over it where code allows.

 

From there we plan the system. TPO is the most common choice for Bay Area commercial buildings: a white, heat-welded membrane that reflects heat and helps meet cool-roof requirements. For a roof that is still sound, a coating may be a lower-cost alternative to replacement, and we will tell you if that fits.

 

A replacement is also the best time to fix what the old roof got wrong. That usually means drainage, insulation levels, curb heights and the flashing at parapets and edges. For our full range of commercial work, see commercial roofing.

What's Included

Commercial Roof Replacement Services

The parts of a replacement that decide how long the new roof lasts.

TPO Roof Systems

Heat-welded white membranes over new insulation.

Tear-Off & Disposal

Old roofing and wet insulation removed and hauled away.

Roof Recover

A new system over a dry existing roof where code allows.

Tapered Insulation

Insulation cut to slope so water reaches the drains.

Curbs & Penetrations

Equipment curbs and roof penetrations reflashed.

Parapets & Edge Metal

Wall flashing, coping and edge metal replaced.

Drains & Scuppers

Drains reset and scuppers relined with the new roof.

Coating Alternative

A coating system when the roof is still sound underneath.

Key Decisions

What Goes Into a Commercial Roof Replacement

Tear-off or recover

A recover installs the new roof over the existing one, saving tear-off cost and disposal. It only works when the existing roof and insulation are dry and code allows another layer. Wet sections have to come out either way, because trapped water damages the deck under the new roof.

Insulation and drainage

Many older commercial roofs pond after every rain because the deck was built nearly flat. Tapered insulation gives the new roof a built-in slope toward drains and scuppers, which is one of the most valuable upgrades a replacement can include.

Title 24 energy code

California’s Title 24 energy code sets cool-roof requirements for many nonresidential low-slope reroofs, and can require added insulation in some cases. We confirm what applies to your building before the job is quoted, so there are no surprises at inspection.

Keeping the building running

Replacements are phased so each section is watertight before work stops for the day. We schedule deliveries, crane lifts and noisy work around tenants and business hours as much as the job allows.

Permits and inspections

Commercial reroofing generally requires a permit and inspections. We take care of the permit and coordinate inspections with the building’s schedule.

Timing and budget

The dry season is the easiest time to replace a large roof. If a roof needs to last a little longer before a planned replacement, targeted repairs or a coating can bridge the gap. See commercial roof repair.

How It Works

How a Commercial Roof Replacement Works

1

Call Us

Call or send the form and tell us about the building and its roof.

2

Schedule

We assess the roof, check for trapped moisture and review drainage and code requirements.

3

We Work

The old roof is removed or prepared, then the new system is installed in watertight phases.

4

Follow-Up

A final walk of the roof with you, with permits closed out.

Before You Commit

Make Sure Replacement Is the Right Call

Not every aging commercial roof needs replacing now. If the roof is dry underneath and the problems are surface wear and weathered seams, a roof coating can add years for a fraction of the cost.

 

A commercial roof inspection with moisture checks shows how much of the roof is wet, which is the single biggest factor in the decision. Call (707) 470-7181 to schedule one.

Common Questions

Commercial Roof Replacement Questions

How long does a commercial roof replacement take?

It depends on the size of the roof, the system and how much wet insulation has to be removed. We give you a phased schedule with the estimate.

Can a new commercial roof go over the old one?

Sometimes. A recover is possible when the existing roof is dry and code allows another layer. Wet areas still have to be removed.

Does Title 24 affect a commercial reroof?

Title 24 sets cool-roof requirements for many nonresidential low-slope reroofs and can require added insulation in some cases. We confirm what applies before quoting.

What is the best roof system for a commercial building?

For many Bay Area buildings, TPO is a strong choice: reflective, heat-welded and cost-effective. The right system depends on the building, its use and its budget.

Can the building stay open during the replacement?

Usually, yes. Work is phased so each section is watertight at the end of the day, and noisy work is scheduled around business hours where possible.

Service Area

Commercial Roof Replacement Across the Bay Area

We replace commercial roofs from Suisun City across Solano County, Contra Costa County, Alameda County and Santa Clara County, including San Jose.